Skip to content
  • USA STOREFRONT
  • CANADA STOREFRONT
  • SUPPORT
  • WARRANTY
  • RMA
  • CONTACT SALES
  • Search
Back Home
  • About Us
    • About ADS
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction & Prevention Solutions
    • CSO Monitoring & Reporting Solutions
    • I/I Reduction Solutions
    • Capacity Management Solutions
    • Accurate Billing Solutions
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT™
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE™-UL
    • RainAlert III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
Back Home
  • Search
  • About Us
    • About Us
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction and Overflow Prevention Solutions
    • CSO Monitoring and Reporting
    • I/I Reduction Solutions
    • Capacity Management
    • Accurate Sewer Billing
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE-UL
    • RainAlert® III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • ADS Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
  • USA Storefront
  • Canada Storefront
Inflow and Infiltration

Do you have guidance standard operating procedures for accepting provisional data in PRISM into approved data?

Published January 23, 2026
A

Do you have guidance standard operating procedures for accepting provisional data in PRISM into approved data?

Yes. ADS flow monitoring services, including data approval in PRISM, are governed by written procedures that are part of our quality assurance and quality control program which is certified under ISO 9001: 2015 standards.

You may also like

What is a combined sewer overflow (CSO)?
Published January 29, 2026

What is a combined sewer overflow (CSO)?

A CSO is a discharge of a mixture of stormwater and untreated wastewater that occurs when the capacity of a combined sewer […]

Can I add a Location from the Home page rather than going to the Customer Editor?
Published January 23, 2026

Can I add a Location from the Home page rather than going to the Customer Editor?

Yes. Select the Action in the bottom left-hand corner of the Map ( Home page). Select the Add Location icon.

What is Meant by “Hydraulics at High d/D”?
Published January 29, 2026

What is Meant by “Hydraulics at High d/D”?

• In circular pipes, velocity at partial flow can exceed the full-flow velocity, with maximum velocity typically occurring around d/D ≈ 0.8.• […]

Can I select multiple locations to print graphs?
Published January 23, 2026

Can I select multiple locations to print graphs?

No, not at this time. Each location graph must be printed individually.

Post navigation

  • Previous post The specified minimum inter-event time may impact the results of an I/I analysis.?ÿ How big of an impact is there when you vary this parameter?
  • Back to post list
  • Next post What is the difference between sanitary, storm, and combined sewers?

CORPORATE OFFICE


  • 340 The Bridge Street, Suite 204
  • Huntsville AL 35806

CONTACTS


  • E. adsinfo@idexcorp.com
  • T. 800 633 7246

DOCUMENTATION


  • Legal Notice     |     Your Privacy Rights
  • Intellectual Property
  • ADS Terms and Conditions
  • PRISM User Agreement
  • PRISM Privacy Policy
  • ADS Web Privacy Statement
  • ADS Cookie Notice
  • ADS Process and Specifications 

© 2026 ADS – All rights reserved

Powered by WP – Designed with the Customizr theme