Yes. ADS flow monitoring services, including data approval in PRISM, are governed by written procedures that are part of our quality assurance and quality control program which is certified under […]
FAQ Category: Inflow and Infiltration
Empirical data suggests that the ideal basin size is around 10,000 LF of sewer, with a goal of maximizing granularity to minimize follow-on condition assessments such as manhole inspection, smoke […]
The nature of the hydraulic conditions at a given location are the primary driver of the technology selected with the purpose of the data being a secondary concern. With that […]
Years ago, there was a significant difference, as permanent flow monitors were connected to a telephone line and temporary monitors required a manual cable connection to retrieve data. With mobile […]
Once suitable locations are identified and flow monitors have been properly installed, routine data review is used to make sure that flow monitors are working correctly. At ADS, we use […]
Gravity sewers typically need to have flow depths less than full pipe for sensors to be properly installed, maintained, or removed. However, once installed they can measure flow depth and […]