Skip to content
  • USA STOREFRONT
  • CANADA STOREFRONT
  • SUPPORT
  • WARRANTY
  • RMA
  • CONTACT SALES
  • Search
Back Home
  • About Us
    • About ADS
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction & Prevention Solutions
    • CSO Monitoring & Reporting Solutions
    • I/I Reduction Solutions
    • Capacity Management Solutions
    • Accurate Billing Solutions
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT™
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE™-UL
    • RainAlert III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
Back Home
  • Search
  • About Us
    • About Us
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction and Overflow Prevention Solutions
    • CSO Monitoring and Reporting
    • I/I Reduction Solutions
    • Capacity Management
    • Accurate Sewer Billing
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE-UL
    • RainAlert® III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • ADS Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
  • USA Storefront
  • Canada Storefront
Inflow and Infiltration

Do you have guidance standard operating procedures for accepting provisional data in PRISM into approved data?

Published January 23, 2026
A

Do you have guidance standard operating procedures for accepting provisional data in PRISM into approved data?

Yes. ADS flow monitoring services, including data approval in PRISM, are governed by written procedures that are part of our quality assurance and quality control program which is certified under ISO 9001: 2015 standards.

You may also like

What is open-channel flow?
Published January 29, 2026

What is open-channel flow?

Open-channel flow is water movement in a conduit that is not completely full and has a free surface exposed to the atmosphere, […]

Why is High d/D a Concern?
Published January 29, 2026

Why is High d/D a Concern?

• High d/D values indicate low residual capacity; agencies flag pipes with high d/D and low reserve capacity for further evaluation or […]

What does d/D Mean?
Published January 29, 2026

What does d/D Mean?

How do we decide how long the monitoring period needs to be?
Published January 23, 2026

How do we decide how long the monitoring period needs to be?

An I/I study needs sufficient data to characterize both dry weather and wet weather performance at each flow monitor location, and in […]

Post navigation

  • Previous post The specified minimum inter-event time may impact the results of an I/I analysis.?ÿ How big of an impact is there when you vary this parameter?
  • Back to post list
  • Next post What is the difference between sanitary, storm, and combined sewers?

CORPORATE OFFICE


  • 340 The Bridge Street, Suite 204
  • Huntsville AL 35806

CONTACTS


  • E. adsinfo@idexcorp.com
  • T. 800 633 7246

DOCUMENTATION


  • Legal Notice     |     Your Privacy Rights
  • Intellectual Property
  • ADS Terms and Conditions
  • PRISM User Agreement
  • PRISM Privacy Policy
  • ADS Web Privacy Statement
  • ADS Cookie Notice
  • ADS Process and Specifications 

© 2026 ADS – All rights reserved

Powered by WP – Designed with the Customizr theme