Skip to content
  • USA STOREFRONT
  • CANADA STOREFRONT
  • SUPPORT
  • WARRANTY
  • RMA
  • CONTACT SALES
  • Search
Back Home
  • About Us
    • About ADS
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction & Prevention Solutions
    • CSO Monitoring & Reporting Solutions
    • I/I Reduction Solutions
    • Capacity Management Solutions
    • Accurate Billing Solutions
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT™
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE™-UL
    • RainAlert III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
Back Home
  • Search
  • About Us
    • About Us
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction and Overflow Prevention Solutions
    • CSO Monitoring and Reporting
    • I/I Reduction Solutions
    • Capacity Management
    • Accurate Sewer Billing
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE-UL
    • RainAlert® III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • ADS Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
  • USA Storefront
  • Canada Storefront
PRISM Reports

What are the Uptime Report values based on?

Published January 23, 2026
A

What are the Uptime Report values based on?

The Uptime Report values are based on the data availability from the previous calendar day for UNIDEPTH, VELOCITY and Qcontinuity.

You may also like

How do you make sure that the monitor is intact given that the sewer environment has noxious gases which will corrode the metallic parts of the monitor?
Published January 23, 2026

How do you make sure that the monitor is intact given that the sewer environment has noxious gases which will corrode the metallic parts of the monitor?

Product design takes this into account, and materials that are used should be compatible with these environments.

What is real-time monitoring?
Published January 29, 2026

What is real-time monitoring?

Real-time monitoring is the continuous collection and transmission of sensor data with minimal delay, enabling near-instant visibility into sewer conditions and faster […]

What is stormwater runoff?
Published January 29, 2026

What is stormwater runoff?

 Stormwater runoff is rain or snowmelt that flows over land surfaces, streets, and roofs instead of soaking into the ground, often entering […]

What types of files can I upload to the Vault?
Published January 23, 2026

What types of files can I upload to the Vault?

There are three categories of files you can upload to PRISM: Files , Location and Data . Select Files to import a […]

Post navigation

  • Previous post What is a wastewater collection system?
  • Back to post list
  • Next post Can I change the data entity colors on the Locations Dashboard?

CORPORATE OFFICE


  • 340 The Bridge Street, Suite 204
  • Huntsville AL 35806

CONTACTS


  • E. adsinfo@idexcorp.com
  • T. 800 633 7246

DOCUMENTATION


  • Legal Notice     |     Your Privacy Rights
  • Intellectual Property
  • ADS Terms and Conditions
  • PRISM User Agreement
  • PRISM Privacy Policy
  • ADS Web Privacy Statement
  • ADS Cookie Notice
  • ADS Process and Specifications 

© 2026 ADS – All rights reserved

Powered by WP – Designed with the Customizr theme