Skip to content
  • USA STOREFRONT
  • CANADA STOREFRONT
  • SUPPORT
  • WARRANTY
  • RMA
  • CONTACT SALES
  • Search
Back Home
  • About Us
    • About ADS
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction & Prevention Solutions
    • CSO Monitoring & Reporting Solutions
    • I/I Reduction Solutions
    • Capacity Management Solutions
    • Accurate Billing Solutions
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT™
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE™-UL
    • RainAlert III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
Back Home
  • Search
  • About Us
    • About Us
    • IDEX Corporation
    • ACCUSONIC
  • Solutions
    • Screening Level Assessment
    • Blockage Prediction and Overflow Prevention Solutions
    • CSO Monitoring and Reporting
    • I/I Reduction Solutions
    • Capacity Management
    • Accurate Sewer Billing
  • Products and Services
    • FlowSIGHT
    • PRISM™
      • SLiiCER®
      • Blockage PREDICT
    • TRITON+®
      • ParaFlow™
    • ECHO™
    • ForeSITE-UL
    • RainAlert® III
    • ACCUSONIC Flowmeters
    • Services
    • D-Site
    • I-Site
  • Resources
    • News
    • Literature
    • Video Library
    • ADS Product Manuals
    • White Papers
    • Industry Articles
    • Software Downloads
    • Sewer Sociology
    • Scattergraph Principles
    • Webinars
  • Contact Us
    • Sales Contact
    • Customer Support
    • Careers
    • Warranty Submittal
  • USA Storefront
  • Canada Storefront
PRISM Reports

What are the Uptime Report values based on?

Published January 23, 2026
A

What are the Uptime Report values based on?

The Uptime Report values are based on the data availability from the previous calendar day for UNIDEPTH, VELOCITY and Qcontinuity.

You may also like

Can I not save the parameters I enter to generate graphs? I do not want to enter the same information each time I graph the data.
Published January 23, 2026

Can I not save the parameters I enter to generate graphs? I do not want to enter the same information each time I graph the data.

The ability to save templates is recognized as needed and will be available in PRISM in the near future.

What is a submerged pressure transducer?
Published January 29, 2026

What is a submerged pressure transducer?

A submerged pressure transducer is a sensor placed under water that converts the pressure exerted by the water column into a level […]

What is a sanitary sewer overflow (SSO)?
Published January 29, 2026

What is a sanitary sewer overflow (SSO)?

An SSO is a discharge of raw or partially treated sewage from a separate sanitary sewer system before it reaches the treatment […]

How do I access graphical data from the Home page?
Published January 23, 2026

How do I access graphical data from the Home page?

You can access graphical data from the Home page through the Location Properties page. Select a location through the mapƒ s Search […]

Post navigation

  • Previous post What is a wastewater collection system?
  • Back to post list
  • Next post Can I change the data entity colors on the Locations Dashboard?

CORPORATE OFFICE


  • 340 The Bridge Street, Suite 204
  • Huntsville AL 35806

CONTACTS


  • E. adsinfo@idexcorp.com
  • T. 800 633 7246

DOCUMENTATION


  • Legal Notice     |     Your Privacy Rights
  • Intellectual Property
  • ADS Terms and Conditions
  • PRISM User Agreement
  • PRISM Privacy Policy
  • ADS Web Privacy Statement
  • ADS Cookie Notice
  • ADS Process and Specifications 

© 2026 ADS – All rights reserved

Powered by WP – Designed with the Customizr theme