It varies. Ideally, this task should be performed during the initial planning stages of an I/I study. From a practical standpoint, whoever has control of the GIS data should be […]
FAQ Category: Inflow and Infiltration
Yes. ADS flow monitoring services, including data approval in PRISM, are governed by written procedures that are part of our quality assurance and quality control program which is certified under […]
Empirical data suggests that the ideal basin size is around 10,000 LF of sewer, with a goal of maximizing granularity to minimize follow-on condition assessments such as manhole inspection, smoke […]
The nature of the hydraulic conditions at a given location are the primary driver of the technology selected with the purpose of the data being a secondary concern. With that […]
Years ago, there was a significant difference, as permanent flow monitors were connected to a telephone line and temporary monitors required a manual cable connection to retrieve data. With mobile […]
Once suitable locations are identified and flow monitors have been properly installed, routine data review is used to make sure that flow monitors are working correctly. At ADS, we use […]